Interior parts covering equipment

Interior parts covering equipment

Publisher: suzhou kailinneng automation equipment co., LTD Release time:2023-03-23 15:23:11 Click on the number of times:56 Shut down
1. Put the product into the fetal gear;
2. When exiting the security zone, press the start button;
3. The rear infrared heating system moves forward to the position of the product, and then moves down to heat and activate the glue at the junction of the skin and skeleton of the product. After heating for a certain time, the heating system lifts up and returns to the original position at the rear side (the heating time can be set to the touch screen);
4. The upper die is lowered to the closing position, and the upper tire film prepresses the product;
5. The edge pushing blocks around the product should be folded in the order of action;
6. Take out the product manually after the coating is completed;
7. Cycle in turn;